Concrete then steel — the two-trade job

Carport and Concrete Slab in Arlington, TX

A carport on a new pad is two jobs, and most companies only sell one half of it. Somebody pours a slab and leaves. Weeks later somebody else turns up with a hammer drill, makes holes in concrete that has already hardened, and hopes the columns land where the drawing said they would.

We do both halves. The concrete crew pours the pad with the column layout already marked and the anchor bolts set in the wet mix; the steel crew builds the frame in the shop while it cures, then sets it. Per-item pricing for each trade lives on the shops’ own sites — CJM Concrete and CJM Metals — and this page is about the part neither of them can do alone: the handoff between them.

01

Who does which half

Concrete first. The pad gets its base graded and compacted, forms set square to the columns rather than to the fence line, reinforcement sitting at depth on chairs, and the slab thickened where the column loads come down. Control joints get laid out so a joint does not run through the middle of a base plate.

Steel second. Columns, beams, purlins and the roof are cut, welded and coated on the shop benches from the dimensions we measured, then trucked out and set, plumbed and tightened. Same office booking both, so nobody is waiting on a phone call from the other trade.

What you get is one walk-through covering both, one written estimate with the concrete and the steel broken out as separate lines, and one company answering at hand-over. Take one line or both — multi-trade projects explains why nothing here is a package.

02

The wait in the middle, and what it is for

Anchor bolts set in green concrete pull out. That is not caution, it is the reason the two trades cannot happen on the same day, and it is why a carport quoted as a one-week job by somebody who only does steel usually turns into three visits.

The project planner puts three working days of cure between the pour and the day the steel crew anchors into it, on top of the normal handoff between crews. Fresh concrete is walkable in about a day, takes light vehicle traffic in about a week, and keeps gaining strength for a month — so the pad is not ready for a car the day the frame goes up either.

The wait costs nothing when it is planned, because fabrication is happening in the shop through the whole of it. That is the only reason booking the two together is faster than booking them apart.

03

Cast-in beats drilled-in

Anchor bolts cast into a wet pour are held by the whole slab. A wedge anchor drilled in afterwards is held by whatever concrete happens to be around the hole — and on a carport the columns land near the slab edge, which is where there is least concrete to hold on to and most risk of spalling a corner off while you drill.

Setting them in the pour also means the layout is checked against the real steel before there is anything to correct. Column spacing gets templated off the fabrication drawing, not measured off a slab that has already set. If a bay comes out an inch wide, we find it with a tape and a wet form rather than with a hammer drill.

On an existing pad none of that is available, and drilled anchors are the honest answer — see the questions below.

04

What the pad has to do besides hold columns

It has to drain. A cover keeps rain off the middle and dumps it in a line along the edges, so the slope has to send that water away from the house rather than pooling against a post base — which is where steel rusts first.

North Texas clay moves. It swells when it is wet and shrinks in an August drought, and a slab that is going to carry point loads at four or six columns needs its reinforcement and its thickness planned for that, not just for the weight of a car.

And a carport is a structure. In almost every city around here that means a building permit, sometimes with an inspection before the pour while the steel and the grade are still visible. We confirm what your city wants during the walk-through — licensed and insured covers how that works.

— What we offer

Pad, formed and poured

Compacted base, reinforcement at depth, thickened where the columns land, joints laid out around them.

Anchors set, not drilled

Base-plate layout templated off the fabrication drawing and cast into the wet pour.

Frame built while it cures

Square tube, channel and roof cut, welded and coated in the shop during the cure wait.

One schedule, one estimate

Concrete and steel broken out as separate lines, with the cure wait already in the dates.

— Our work

Finished work.

Project photos on request.

We’re photographing recent work for this page. In the meantime, we’ll gladly send photos of jobs like yours.

Call(214) 603-9142

Common questions

Can you put a carport on a slab that is already there?
Often, yes. We look at the thickness, the condition and how much concrete sits between the column position and the slab edge, and then the anchors are drilled rather than cast. If the slab will not hold them we say so and price separate footings instead of talking you into it.
How long between the pour and the steel going up?
The planner allows three working days of cure before anything is anchored into the new slab, plus the normal handoff between crews. Fabrication runs through that window, so the frame is ready when the concrete is. Your real dates come in the written estimate.Full answer
Do I need a permit for a carport?
Almost everywhere around here a carport or covered patio is a building permit, and some cities want to inspect before the pour. Which permits your job needs, and who pulls them, gets confirmed with your city during the free walk-through and written into the estimate.Full answer

Pad and cover, one job?

Send the footprint, the height you need to clear and what is parking under it. One walk-through covers the concrete and the steel, and the estimate breaks out both.

What helps us prepare your quote
  • List the trades your project needs: concrete, metal fabrication and/or industrial insulation.
  • Send the job location, photos or plans, and the order in which the work needs to happen.
  • Use one request for the combined scope. For a single trade, its CJM website has the detailed service and design options.

— Start your project

Tell us what you need built.

Tell us the basics. We’ll confirm the scope and whether a site visit is needed, then provide a written estimate.

or call(214) 603-9142· Se habla español

Text us a photo and we can usually quote from it.

Add details (optional) — address, how to reach you, project notes